A phased replacement of near end-of-life condensers with new improved energy efficient technology at a mission critical data centre. Main data centre space reclaimed with the construction of a brand new UPS facility.
Read MoreKnight Frank, the global property adviser, has released key findings from its Data Centre Report 2021 which evidences that the data centre market has experienced strong momentum in 2021.
Read MoreDCS talks to Alex Dorn, Engineering Manager at Future Facilities, about the work Future Facilities carried out with Kao Data and JCA Engineering, to help design the UK’s first 100% free cooling, wholesale colocation facility. The use of both CFD analysis and digital twin technology played a major part in the success of the project and, indeed, continues to deliver benefits as IT resources are deployed within the facility.
Watch nowBusinesses from a wide range of sectors are fuelling demand for “greener” data centres, bringing environmental issues to the forefront of the data centre industry.
Read MoreFuture Facilities has worked in partnership with Hewlett Packard Enterprise (HPE), New Generation and Watt Design on Thésée DataCenter’s new colocation facility. The 6Sigma Digital Twin has been used to test the proposed data center’s design using CFD simulation. In addition, the Future Facilities solution has been embedded into the Data Center Management System (DCMS) to enrich end-customer experience and help Thésée DataCenter maximise operational efficiency of its data center.
Read MoreDCS talks with Paul Smethurst, Chair and Ian Bitterlin, Specialist Advisor, both of the DCA’s Commissioning SIG, to find out more about the work the group is doing to educate the industry when it comes to the many, varied complexities of data centre testing and commissioning.
Watch now