Why every data centre needs a permanently installed resistive loadbank

UK LOADBANK manufacturer, Hillstone Products, has developed a load bank solution to increase reliability, efficiency, and uptime performance whilst reducing energy costs when operating a datacentre.

  • Monday, 6th February 2017 Posted 7 years ago in by Phil Alsop
The loadbank_GENSET range has been designed to overcome fuel being the single point of failure in a datacentre and to prevent breaches in generators Service Level Agreement ( SLA ) & warranty conditions by maintaining best practice expected in mission critical datacentre infrastructure.

 

The release of the loadbank_GENSET range coincides with six months’ extensive research, by Hillstone’s MD Paul Smethurst, which has looked at the consequences of supporting low IT load with generator backup systems that are dimensioned against maximum operating scenarios.

 

Smethurst states “The benefits of having a permanent load bank connected to the genset system include:

-          validation of Fuel Supplies,

-          prevention of Wet Stacking

-          associated operating savings in energy costs

to creates a very short ROI by improvements of best practice and ensuring uptime performance.”

 

The loadbank_GENSET range is designed using the latest PLC technology to deliver a dual automatic & manual operation with open software interfacing to BMS & DCIM systems.

 

The loadbank_GENSET range moves the load bank industry away from expensive propriety control systems.

 

Hillstone will be exhibiting at DCW17, ExCel, London 14th & 15th March 2017 on Stand L80 and are also the LOADBANK sponsor for the Live Green Datacentre