Future Facilities has worked in partnership with Hewlett Packard Enterprise (HPE), New Generation and Watt Design on Thésée DataCenter’s new colocation facility. The 6Sigma Digital Twin has been used to test the proposed data center’s design using CFD simulation. In addition, the Future Facilities solution has been embedded into the Data Center Management System (DCMS) to enrich end-customer experience and help Thésée DataCenter maximise operational efficiency of its data center.
Read MoreDCS talks with Paul Smethurst, Chair and Ian Bitterlin, Specialist Advisor, both of the DCA’s Commissioning SIG, to find out more about the work the group is doing to educate the industry when it comes to the many, varied complexities of data centre testing and commissioning.
Watch nowTo help mitigate the rise of emissions from digital devices, the new Digital Economy and Climate Impact report recommends continuing efforts to achieve efficiencies on IT and energy sides, at component and system levels.
Read Morei3 Solutions Group and EYP Mission Critical Facilities GHG Abatement Group Second White Paper details why we need standby power and why natural gas blended with hydrogen could be the fuel of choice for the next decade.
Read MorePrevalidated architectures reduce engineering time by 40% to combine fault tolerance, virtualisation, smart uninterrupted power, and environmental monitoring.
Read MoreCyrusOne has achieved 100% renewable energy across its full European portfolio, nine years ahead of the 2030 target outlined in the self-regulatory Climate Neutral Data Center Pact, of which CyrusOne is a founding member.
Read More